Supa MIDC
On site · We are on the estate
Supa Parner, Tal. Parner, Dist. Ahilyanagar
The original estate covers about 330 hectares, with a further 947 hectares notified for Supa Parner Phase II. Within that expansion, 230 hectares is reserved for an exclusive Japanese industrial park under an MoU between JETRO and MIDC. Supa is a mixed estate rather than an auto cluster, which means the recurring work here is tooling and maintenance rather than prototyping.
What is manufactured there
- Castings and foundry work
- Boiler and pressure vessel manufacture
- Precision components
- Pre-engineered buildings and structural fabrication
- Food processing
- Synthetic resins and plastics
- Steel processing
What we typically print for it
- Patterns and core boxes for sand casting
- Welding and assembly fixtures
- Drilling and marking templates with steel bushings
- Machine change-parts, guides and chutes
- Obsolete spares copied from the broken original
- Inspection and go/no-go gauges
Getting parts to you: Walk it over, or send someone on a two-wheeler. Most Supa jobs get collected and returned by hand the same week, and there is no courier charge on anything within the estate.